Instrument status

Non Operational Non operational  Some Issues Some issues  Operational Operational 

Acronym Guarantor Expected date of repair Modified on Comment
Non Operational WOOLLAM-VIS Alois Nebojsa 22.8.2022 26.5.2022 10:10 The monochromator is out of order
Non Operational HELIOS Ondřej Man, Ph.D. 15. - 19.08.2022 9.8.2022 17:16 LMIS depleted
Non Operational PECVD-NANOFAB Marek Eliáš, Ph.D. 30.8.2022 13.6.2022 09:42 the heater is broken
Non Operational VERSALAB Klára Jelénková ?? 4.8.2022 18:48 Compressor issue, system at room temperature
Some Issues NANOSAM Petr Bábor, Ph.D. 2.6.2022 09:47 Scan+24V readout Error (physical voltage OK); (mechanical) noise; Prep. chamber - ion gauge fil #2 only
Some Issues KRATOS-XPS Josef Polčák, Ph.D. 9.8.2022 22:50 X-ray filament has been changed. Transfer stub side entry holder to the SAC needs to confirm dialog ,for using heat/cool or azimuthal sample holder ask guarantor
Some Issues SUMMIT Radim Hrdý, Ph.D. August 22.3.2021 12:47 Light source malfunction
Some Issues LYRA Tomáš Šamořil, Ph.D. May/June 2022 23.3.2022 14:50 Right nanomanipulator out of order
Some Issues UHV-PLD Marek Otevřel, Ph.D. 6.12.2021 15:48 Heating laser not operational - a cooling regulation issue
Some Issues SEE-SYSTEM Kateřina Polášková 21.4.2022 13:18 Lacking ventilation, only non-toxic chemicals can be used
Some Issues CRYOGENIC Klára Jelénková not known yet 5.8.2022 10:39 VSM coils are broken (sent for repair).
Operational MIRA3-XMU Petr Lepcio, Ph.D. 5.5.2022 6.5.2022 08:47
Operational LPCVD-polySi Filip Münz, Ph.D. 9.2.2018 16:45
Operational KERR-MICROSCOPE Klára Jelénková 17.8.2021 12:15
Operational NIRQUEST512 Alois Nebojsa 31.3.2020 09:16
Operational JAZ3-CHANNEL Alois Nebojsa 31.3.2020 09:15
Operational JPK-NANOWIZARD Petr Lepcio, Ph.D. 6.3.2020 14:49
Operational LEXT-OLS4100 Petr Lepcio, Ph.D. 9.3.2020 17:10
Operational Q-LAB Filip Ligmajer, Ph.D. 7.9.2020 09:08
Operational UHV-FTIR Marek Otevřel, Ph.D. 7.10.2020 13:37
Operational ZEISS-A2 Vojtěch Švarc 10.9.2019 16:44
Operational IR-RAMAN Alois Nebojsa 28.1.2021 15:29
Operational PECVD Marek Eliáš, Ph.D. 22.5.2022 22:01 s
Operational ULTRAFAST-LASER Ondřej Wojewoda 21.6.2021 15:06
Operational HENRY-MAGNET Ondřej Wojewoda 12.3.2021 12:42
Operational RIGAKU3 Pavla Roupcová, Ph.D. 29.11.2021 19:13
Operational 3D-PRUSA-ORANGE Peter Fecko 26.01.2021 31.1.2022 11:00
Operational SAW-ACCUTOM Jiří Holas 27.8.2021 13:54
Operational MPS150 Radim Hrdý, Ph.D. 25.6.2021 09:54
Operational RIE-FLUORINE Marek Eliáš, Ph.D. 1.4.2022 6.4.2022 15:01
Operational ALD Marek Eliáš, Ph.D. 20.7.2021 12:53
Operational SUSS-RCD8 Radim Hrdý, Ph.D. 8.8.2022 14:59
Operational DIENER Marek Eliáš, Ph.D. 9.2.2018 16:38
Operational MIRA Vojtěch Švarc 16.5.2022 16:31
Operational SNOM-NANONICS Petr Dvořák, Ph.D. 9.2.2018 17:18
Operational TERS Filip Münz, Ph.D. 9.2.2018 16:48
Operational ICON-SPM 6.4.2022 13:24
Operational SIMS Petr Bábor, Ph.D. 8.11.2021 11:00
Operational MONOWAVE_400 Kateřina Tmejová 28.5.2021 09:51
Operational NANOCALC Vojtěch Švarc 24.5.2018 13:52 Nanocalc is located on the VirtualBox PC (Nanocalc-PC on the desktop) on DEKTAK computer
Operational CHEMLAB-B1.14 Kateřina Tmejová 22.6.2021 11:27
Operational STEMI Jiří Holas 27.8.2021 14:02
Operational DHR2_RHEOMETER Petr Lepcio, Ph.D. 3.8.2021 09:25
Operational FTIR-CHEMLAB Petr Lepcio, Ph.D. 3.8.2021 09:23
Operational LEICACOAT-STAN Jiří Holas 27.8.2021 14:25
Operational TIC3X Ondřej Man, Ph.D. 18.3.2022 19:16 Testing after re-commissioning
Operational 3D-PRUSA-BLACK Peter Fecko 4.8.2021 10:54
Operational SW-BEAMER 22.6.2018 08:43
Operational DRIE Marek Eliáš, Ph.D. 5.1. 2022 2.1.2022 22:48 problem with vacuum switcher
Operational SW-LAB 22.6.2018 08:43
Operational SW-TRACER 22.6.2018 08:43
Operational FISCHIONE-200 Jiří Holas 23.2.2018 11:55
Operational TENUPOL Jiří Holas 27.8.2021 14:06
Operational SPONGEBOB Eric Daniel Glowacki, Ph.D. 26.8.2021 14:05
Operational RAITH Zuzana Lišková, Ph.D. 12.1.2022 10:01
Operational LECTROPOL Jiří Holas 3.9.2021 10:21
Operational EVAPORATOR Jan Prášek, Ph.D. 24.6.2021 17:27
Operational EXPERIMENTAL-PECVD Lenka Zajíčková, Ph.D. 11.6.2020 11:19
Operational UHV-DEPOSITION Marek Otevřel, Ph.D. 6.8.2018 13:27
Operational CLARUS-680 Jana Brtníková, Ph.D. 12.1.2022 09:53
Operational UHV-LEEM Marek Otevřel, Ph.D. 21.10.2021 10:04 Problems with imaging - probably a electron optics problem
Operational DAWN-HELEOS Jana Brtníková, Ph.D. 12.1.2022 09:53
Operational UHV-LEIS Marek Otevřel, Ph.D. 9.2.2018 17:09
Operational BET_ANAMET Kateřina Tmejová 3.2.2022 09:50 Please, if you need BET_DEGASSER, make reservation separately.
Operational UHV-MBE Marek Otevřel, Ph.D. 15.2.2021 13:04
Operational BET_DEGASSER Kateřina Tmejová 3.2.2022 09:47 Please, make reservation for BET_ANAMET separately.
Operational UHV-XPS Marek Otevřel, Ph.D. 3.8.2022 13:14
Operational NMR_MAGRITEK Kateřina Tmejová 9.2.2022 09:36 available from 21/2/2022
Operational UHV-PREPARATION Marek Otevřel, Ph.D. 7.1.2019 13:09 Burnt filament at the LEED system.
Operational UHV-SPM Marek Otevřel, Ph.D. 3.5.2021 12:24
Operational FUMEHOOD-SOLVENTS-I Jiří Zita, Ph.D. 4.10.2021 18:04
Operational FISCHIONE-170 Jiří Holas 2.9.2021 15:12
Operational FUMEHOOD-SOLVENTS-II Jiří Zita, Ph.D. 4.10.2021 18:05
Operational DWL Radim Zahradníček, Ph.D. 31.3.2022 17:03
Operational FTIR Alois Nebojsa 13.5.2022 08:29
Operational CITOVAC Jiří Holas 27.8.2021 14:22
Operational VUVAS Alois Nebojsa 26.1.2020 26.1.2021 15:29 D2 lamp connector reinstalled
Operational TGA96 Jaroslav Kaštyl, Ph.D.
Operational TEGRAMIN Jiří Holas 27.8.2021 13:38
Operational TITAN Jan Michalička 18.10.2021 15:16
Operational VERIOS Ondřej Man, Ph.D. 27.6.2022 15:15
Operational WIRE-BONDER Radim Hrdý, Ph.D. 9.2.2018 17:08
Operational RIGAKU9 Ondřej Caha, Ph.D. 21.7.2022 14:14
Operational NANOINDENTER M.Sc. Saeed Mirzaei, Ph.D. 21.4.2021 09:19
Operational DICING-SAW Radovan Klusák 8.8.2022 13:56
Operational VNA-MPI Michal Urbánek, Ph.D. 13.5.2018 21:02
Operational BRILLOUIN Ondřej Wojewoda 20.12.2021 10:15
Operational PARYLENE Peter Fecko 8.8.2022 11:33 Small leakage.
Operational XEF2 Peter Fecko 16.7.2021 16:36
Operational MECHANICAL-WORKSHOP Dominik Varga 27.8.2018 16:23 Only for CF staff (for full-service ask Dominik Varga)
Operational ZEISS-Z1M Jiří Holas 27.8.2021 13:44
Operational WITEC-RAMAN Zdeněk Spotz, Ph.D. 13.6.2022 13:24
Operational SCIA Marek Eliáš, Ph.D. 6.6.2022 29.6.2022 15:42 servis of MW source
Operational FISCHIONE-TEM MILL Jiří Holas 27.8.2021 13:50
Operational KAUFMAN Imrich Gablech, Ph.D. 14.7.2022 17:41
Operational micro-CT-L240 Martin Kareš 26.2.2018 16:52
Operational KEITHLEY-4200 Radim Hrdý, Ph.D. 6.1.2022 17:27
Operational LEICA-TXP Jiří Holas 27.8.2021 14:33
Operational CPD-Autosamdri-815B Jiří Zita, Ph.D. 27.2.2019 16:34
Operational RIE-CHLORINE Marek Eliáš, Ph.D. 5.5.2022 8.5.2022 20:56 leak in the cooling system
Operational LEICACOAT-NANO Vojtěch Švarc 16.4.2021 10:05
Operational NANOSCAN Dr. Ing. Michal Staňo 8.2.2022 17:13 laser repaired (starts immediately)
Operational GLOVEBOX Filip Münz, Ph.D. 13.5.2019 15:57
Operational LASER-DICER Michal Potoček, Ph.D. 29.3.2021 18:59
Operational LAURELL Vojtěch Švarc 15.7.2019 27.6.2019 10:10
Operational LIBS 26.2.2018 16:52
Operational LITESCOPE 23.6.2020 09:17
Operational SUSS-WETBENCH Radim Hrdý, Ph.D. 15.2.2022 11:12
Operational LPCVD-SiN Filip Münz, Ph.D. 9.2.2018 16:44
Operational LAKESHORE Klára Jelénková 30.7.2020 17:08
Operational MAGNETRON Jan Prášek, Ph.D. 19.7.2022 15:35
Operational SUSS-MA8 Vojtěch Švarc 26.7.2022 15:26
Operational DEKTAK Radim Zahradníček, Ph.D. 13.2.2022 18:52
Operational MOCVD Filip Münz, Ph.D. 1.3.2019 5.3.2019 09:58 Testing regime - contact guarantee for assanator training
Operational LABOTOM5 Jiří Holas 27.8.2021 14:23
Operational WOOLLAM-MIR 9.2.2018 16:48
Operational APCVD Filip Münz, Ph.D. 9.2.2018 16:44
Operational CITOPRESS Jiří Holas 27.8.2021 13:53