Instrument status
Non operational
Some issues
Operational
Acronym | Guarantor | Expected date of repair | Modified on | Comment |
---|---|---|---|---|
![]() |
Evelína Gablech, Ph.D. | 1.7.2025 13:22 | Scanning head is back but need to be installed together wit new controller. ICON-SPM IS NOT OPERATIONAL YET. Users will be informed by e-mail. | |
![]() |
Marek Eliáš, Ph.D. | 30.6.2025 14:54 | Installation of a new instrument. It will be in operation on 16.07.2025 | |
![]() |
Josef Polčák, Ph.D. | 4.7.2025 14:39 | The UHV- Deposition is waiting for baking. If everything goes well, it will be ready for operation on Wednesday | |
![]() |
Josef Polčák, Ph.D. | 30.5.2025 16:52 | As decontamination of the MBE chamber. | |
![]() |
Marek Eliáš, Ph.D. | 30.6.2025 14:50 | Installation of a new instrument. It will be in operation on 31/7/2025 | |
![]() |
Marek Eliáš, Ph.D. | 7.7.2025 17:00 | the loadlock must be controlled manually | |
![]() |
Dina Kičmerová, Ph.D. | 24.6.2025 11:33 | EBSD is out of order. | |
![]() |
Ondřej Wojewoda, Ph.D. | 31.3.2025 17:53 | Problems with shutter | |
![]() |
Peter Fecko | 3.3.2025 13:19 | Contact guarantor ONE WEEK PRIOR usage | |
![]() |
Josef Polčák, Ph.D. | 20.6.2025 17:12 | Y-axis movement needs check before transfer - (fixing estimated end of July) | |
![]() |
Petr Lepcio, Ph.D. | 8.7.2025 00:20 | MCT detector out of order | |
![]() |
30.4.2024 | 2.8.2024 09:56 | Záznam 1 | |
![]() |
Peter Fecko | |||
![]() |
Kateřina Tmejová, Ph.D. | 25.6.2025 08:44 | Device is placed in B1.18, new connection of nitrogen | |
![]() |
Kateřina Tmejová, Ph.D. | |||
![]() |
Kateřina Tmejová, Ph.D. | 8.11.2024 19:42 | The service on air flow regulators for hoods, covers, etc. | |
![]() |
Kateřina Tmejová, Ph.D. | 8.11.2024 19:41 | The service on air flow regulators for hoods, covers, etc. | |
![]() |
Zdeněk Spotz, Ph.D. | |||
![]() |
Eva Kolíbalová, Ph.D. | 17.1.2025 15:17 | ||
![]() |
Dinara Sobola, Ph.D. | |||
![]() |
Tomáš Spusta, Ph.D. | |||
![]() |
Viktor Danchuk | 4.3.2025 16:28 | ||
![]() |
Kateřina Tmejová, Ph.D. | |||
![]() |
Kateřina Tmejová, Ph.D. | |||
![]() |
Kateřina Tmejová, Ph.D. | |||
![]() |
Kateřina Tmejová, Ph.D. | |||
![]() |
Kateřina Tmejová, Ph.D. | |||
![]() |
Marek Eliáš, Ph.D. | |||
![]() |
Viktor Danchuk | |||
![]() |
Jan Prášek, Ph.D. | |||
![]() |
28.2.2025 11:00 | |||
![]() |
Tomáš Šamořil, Ph.D. | 17.4.2024 11:09 | ||
![]() |
Richard Kolář | |||
![]() |
Radim Hrdý, Ph.D. | 15.8.2024 16:54 | ||
![]() |
Peter Fecko | 30.3.2023 12:18 | ||
![]() |
Josef Polčák, Ph.D. | 22.8.2024 14:05 | ||
![]() |
Andrea Konečná, Ph.D. | |||
![]() |
Jaganandha Panda | |||
![]() |
Peter Fecko | |||
![]() |
Michal Urbánek, Ph.D. | |||
![]() |
Josef Petruš, Ph.D. | |||
![]() |
Josef Petruš, Ph.D. | 28.4.2025 09:18 | Deformation of Pt wire and heat shield - fixed! Rupture of elastomeric gasket - replaced! | |
![]() |
Petr Lepcio, Ph.D. | |||
![]() |
Petr Lepcio, Ph.D. | |||
![]() |
Petr Lepcio, Ph.D. | 29.7.2024 13:22 | ||
![]() |
Marek Eliáš, Ph.D. | |||
![]() |
Radim Hrdý, Ph.D. | 13.11.2023 09:41 | ||
![]() |
Jiří Holas | 3.4.2025 13:53 | ||
![]() |
Ondřej Man, Ph.D. | 19.10.2023 10:57 | ||
![]() |
Marek Eliáš, Ph.D. | 13.3.2025 17:02 | ||
![]() |
Jiří Holas | 17.10.2024 11:10 | ||
![]() |
Zuzana Lišková, Ph.D. | 5.6.2025 09:26 | ||
![]() |
Jiří Holas | 3.9.2021 10:21 | ||
![]() |
Jan Prášek, Ph.D. | 30.5.2025 11:44 | ||
![]() |
Marek Eliáš, Ph.D. | 10.4.2025 10:51 | ||
![]() |
Ondřej Man, Ph.D. | 20.5.2025 12:39 | ||
![]() |
Jiří Zita, Ph.D. | 6.4.2023 10:48 | ||
![]() |
Jiří Zita, Ph.D. | 6.4.2023 10:50 | ||
![]() |
Jiří Holas | 19.8.2024 13:36 | ||
![]() |
Jan Michalička, Ph.D. | 7.2.2025 13:47 | Probe corrector upgrade | |
![]() |
Marek Eliáš, Ph.D. | 18.6.2025 14:58 | ||
![]() |
Saeed Mirzaei, Ph.D. | 21.4.2021 09:19 | ||
![]() |
Jiří Holas | 27.8.2021 13:44 | ||
![]() |
Marek Eliáš, Ph.D. | 26.2.2025 11:06 | ||
![]() |
Jiří Holas | 15.11.2023 10:34 | ||
![]() |
Imrich Gablech, Ph.D. | 21.2.2023 09:01 | ||
![]() |
Radim Hrdý, Ph.D. | 30.5.2023 15:04 | ||
![]() |
Michal Potoček, Ph.D. | 9.4.2025 13:34 | ||
![]() |
Vojtěch Švarc, Ph.D. | 14.4.2025 11:33 | The sewage tube changed to the small sewage container - clean that after usage | |
![]() |
David Prochazka, Ph.D. | 26.2.2018 16:52 | ||
![]() |
4.6.2024 16:45 | |||
![]() |
Filip Münz, Ph.D. | 6.5.2024 14:56 | ||
![]() |
Klára Jelénková | 19.7.2023 14:49 | Instrument not used for long time, several checks/slight issues need to be resolved. Pumping system and compressor should be perfectly OK. | |
![]() |
Klára Jelénková | 21.3.2025 15:29 | ||
![]() |
Jan Prášek, Ph.D. | 7.7.2025 17:19 | Installed targets: Pt(1), Au(2), Ni(3), Nb(4), FeRh(5), Hf(6), Co(7), Ta(8) + oxygen | |
![]() |
Vojtěch Švarc, Ph.D. | 27.5.2025 12:45 | Theta TSA axis in the state of observation | |
![]() |
Vojtěch Švarc, Ph.D. | 9.10.2023 13:11 | ||
![]() |
Filip Münz, Ph.D. | 5.3.2019 09:58 | Testing regime - contact guarantee for assanator training | |
![]() |
Jiří Holas | 27.8.2021 14:23 | ||
![]() |
9.2.2018 16:48 | |||
![]() |
Jiří Holas | 27.8.2021 13:53 | ||
![]() |
Viktor Danchuk | 15.7.2024 15:05 | The NanoSAM is in operational condition. The ´-24V Error´ is still present, but it doesn´t affect the NanoSAM performance. | |
![]() |
Alois Nebojsa | 4.6.2025 12:05 | ||
![]() |
Vojtěch Švarc, Ph.D. | 10.9.2019 16:44 | ||
![]() |
Jiří Holas | 27.8.2021 13:54 | ||
![]() |
Marek Eliáš, Ph.D. | 25.3.2025 15:09 | ||
![]() |
Radim Hrdý, Ph.D. | 15.8.2024 18:17 | ||
![]() |
Marek Eliáš, Ph.D. | 9.2.2018 16:38 | ||
![]() |
Vojtěch Švarc, Ph.D. | 7.11.2024 22:51 | ||
![]() |
Petr Viewegh, Ph.D. | 9.2.2018 17:18 | ||
![]() |
Filip Münz, Ph.D. | 9.2.2018 16:48 | ||
![]() |
Petr Bábor, Ph.D. | 5.3.2024 14:20 | successful installation. | |
![]() |
Radim Hrdý, Ph.D. | 19.8.2022 10:21 | ||
![]() |
Vojtěch Švarc, Ph.D. | 17.3.2023 11:56 | ||
![]() |
Jiří Holas | 27.8.2021 14:02 | ||
![]() |
Vojtěch Švarc, Ph.D. | 22.6.2018 08:43 | ||
![]() |
Vojtěch Švarc, Ph.D. | 22.6.2018 08:43 | ||
![]() |
Vojtěch Švarc, Ph.D. | 22.6.2018 08:43 | ||
![]() |
Jiří Holas | 27.8.2021 14:06 | ||
![]() |
Josef Polčák, Ph.D. | 4.7.2025 10:15 | ||
![]() |
Stanislav Průša, Ph.D. | 14.9.2023 10:20 | ||
![]() |
Josef Polčák, Ph.D. | 19.5.2025 09:17 | ||
![]() |
Josef Polčák, Ph.D. | 19.5.2025 09:20 | ||
![]() |
26.3.2025 18:05 | |||
![]() |
Josef Polčák, Ph.D. | 19.5.2025 09:19 | ||
![]() |
Jiří Holas | 11.11.2024 11:07 | ||
![]() |
Peter Fecko | 14.4.2025 13:13 | ||
![]() |
Alois Nebojsa | 15.7.2024 10:16 | ||
![]() |
Jiří Holas | 27.8.2021 14:22 | ||
![]() |
15.5.2025 14:27 | |||
![]() |
Radim Hrdý, Ph.D. | 6.5.2025 12:33 | ||
![]() |
Ondřej Caha, Ph.D. | 22.5.2025 08:39 | ||
![]() |
Radovan Klusák | 26.6.2023 14:27 | ||
![]() |
Michal Urbánek, Ph.D. | 30.6.2025 14:20 | ||
![]() |
Peter Fecko | 3.7.2023 12:29 | ||
![]() |
Dominik Varga | 27.8.2018 16:23 | Only for CF staff (for full-service ask Dominik Varga) | |
![]() |
Klára Jelénková | 6.5.2025 16:36 | ||
![]() |
25.10.2024 13:36 | |||
![]() |
Zdeněk Spotz, Ph.D. | 25.6.2025 15:40 | ||
![]() |
Martin Kareš | 26.2.2018 16:52 | ||
![]() |
Jiří Holas | 27.8.2021 14:33 | ||
![]() |
Jiří Zita, Ph.D. | 6.6.2024 10:47 | Minimal CO2 weight for CPD cycle | |
![]() |
Vojtěch Švarc, Ph.D. | 28.8.2023 14:30 | ||
![]() |
Michal Staňo | 18.6.2025 15:25 | Report any errors or non standard behaviour (ScanEngine now running with older LabView RT image backup) | |
![]() |
Filip Münz, Ph.D. | 13.5.2019 15:57 | ||
![]() |
Filip Münz, Ph.D. | 9.2.2018 16:44 | ||
![]() |
Petr Lepcio, Ph.D. | 6.6.2025 18:19 | ||
![]() |
Filip Münz, Ph.D. | 9.2.2018 16:45 | ||
![]() |
Klára Jelénková | 17.8.2021 12:15 | ||
![]() |
Alois Nebojsa | 31.3.2020 09:16 | ||
![]() |
Alois Nebojsa | 31.3.2020 09:15 | ||
![]() |
Evelína Gablech, Ph.D. | 11.10.2024 14:20 | ||
![]() |
Evelína Gablech, Ph.D. | 9.3.2020 17:10 | ||
![]() |
Filip Ligmajer, Ph.D. | 7.9.2020 09:08 | ||
![]() |
Josef Polčák, Ph.D. | 19.5.2025 09:21 | ||
![]() |
Alois Nebojsa | 28.1.2021 15:29 | ||
![]() |
Ondřej Wojewoda, Ph.D. | 21.6.2021 15:06 | ||
![]() |
Ondřej Wojewoda, Ph.D. | 12.3.2021 12:42 | ||
![]() |
Pavla Roupcová, Ph.D. | 27.6.2025 11:39 | Pay attention to the right handling sample holder and the samples | |
![]() |
Peter Fecko | 31.1.2022 11:00 | ||
![]() |
Kateřina Tmejová, Ph.D. | 12.9.2023 10:47 | ||
![]() |
Kateřina Tmejová, Ph.D. | 14.5.2025 09:12 | Fume hood II - Schlenk line instalation, Spincoater is uninstalled - ask the guarantor for reinstall | |
![]() |
Petr Lepcio, Ph.D. | 22.10.2024 18:50 | ||
![]() |
Peter Fecko | 4.8.2021 10:54 | ||
![]() |
Prof. Eric Daniel Glowacki, Ph.D. | 26.8.2021 14:05 | ||
![]() |
Lizeth Katherine Tinoco Navarro | 1.8.2024 10:18 | ||
![]() |
Lizeth Katherine Tinoco Navarro | 23.7.2024 10:55 | ||
![]() |
Kateřina Tmejová, Ph.D. | 4.9.2024 15:08 | Record 1 | |
![]() |
Kateřina Tmejová, Ph.D. | 15.12.2022 08:54 | ||
![]() |
Pawel Jewula, Ph.D. | 11.2.2025 11:11 | A new version of MNOVA was installed. | |
![]() |
Dinara Sobola, Ph.D. | |||
![]() |
Filip Ligmajer, Ph.D. | 2.8.2022 10:33 | contact Filip Ligmajer | |
![]() |
Jan Prášek, Ph.D. | 28.1.2025 14:02 | ||
![]() |
Kateřina Tmejová, Ph.D. | 11.11.2024 13:08 | ||
![]() |
Kateřina Tmejová, Ph.D. | 10.5.2024 11:22 | ||
![]() |
Lizeth Katherine Tinoco Navarro | |||
![]() |
Kateřina Tmejová, Ph.D. | 19.7.2024 11:23 | The removal of the sealing device by the service for inspection |