Instrument status
Non operational
Some issues
Operational
Acronym | Guarantor | Expected date of repair | Modified on | Comment |
---|---|---|---|---|
![]() |
Evelína Gablech, Ph.D. | 22.5.2025 11:54 | ICON-SPM out of service for next 8-10 weeks! SPM head sent for repair to USA (most probably damaged piezo element). Will keep you updated. | |
![]() |
Zdeněk Spotz, Ph.D. | 29.4.2025 09:15 | Raman tower was send to Ulm to repair of input coupler. Supposed arrival start of June. Whole equipement is OUT OF ORDER. | |
![]() |
Petr Lepcio, Ph.D. | 14.4.2025 11:10 | RBSE detector movement issue - sometimes gets stuck when retracting to parking position. Pull out the detector manually by turning the turnwheel on the backside of the detector, if necessary. Service request sent to Tescan, repair date unknown. | |
![]() |
Alois Nebojsa | 12.5.2025 09:31 | Please turn on the vacuum pump (orange device). The ellipsometer is not connected to a central vacuum system. | |
![]() |
Josef Polčák, Ph.D. | 2.5.2025 14:18 | Y-axis movement needs check before transfer | |
![]() |
Marek Eliáš, Ph.D. | 21.5.2025 17:41 | the loadlock must be controlled manually | |
![]() |
Zuzana Lišková, Ph.D. | 18.3.2025 17:03 | RAITH chiller minor issue - follow the rules | |
![]() |
Ondřej Wojewoda, Ph.D. | 31.3.2025 17:53 | Problems with shutter | |
![]() |
Peter Fecko | 3.3.2025 13:19 | Contact guarantor ONE WEEK PRIOR usage | |
![]() |
30.4.2024 | 2.8.2024 09:56 | Záznam 1 | |
![]() |
Vojtěch Švarc, Ph.D. | 28.4.2025 13:34 | TSA theta axis is not working | |
![]() |
Peter Fecko | |||
![]() |
Kateřina Tmejová, Ph.D. | |||
![]() |
Kateřina Tmejová, Ph.D. | |||
![]() |
Filip Münz, Ph.D. | 9.2.2018 16:45 | ||
![]() |
Kateřina Tmejová, Ph.D. | |||
![]() |
Klára Jelénková | 17.8.2021 12:15 | ||
![]() |
Kateřina Tmejová, Ph.D. | |||
![]() |
Alois Nebojsa | 31.3.2020 09:16 | ||
![]() |
Kateřina Tmejová, Ph.D. | |||
![]() |
Alois Nebojsa | 31.3.2020 09:15 | ||
![]() |
Marek Eliáš, Ph.D. | |||
![]() |
Petr Lepcio, Ph.D. | 11.10.2024 14:20 | ||
![]() |
Dr. Viktor Danchuk | 15.7.2024 15:05 | The NanoSAM is in operational condition. The ´-24V Error´ is still present, but it doesn´t affect the NanoSAM performance. | |
![]() |
Dr. Viktor Danchuk | |||
![]() |
Petr Lepcio, Ph.D. | 9.3.2020 17:10 | ||
![]() |
Filip Ligmajer, Ph.D. | 7.9.2020 09:08 | ||
![]() |
Josef Polčák, Ph.D. | 19.5.2025 09:21 | ||
![]() |
Vojtěch Švarc, Ph.D. | 10.9.2019 16:44 | ||
![]() |
Alois Nebojsa | 28.1.2021 15:29 | ||
![]() |
Marek Eliáš, Ph.D. | 21.7.2023 14:37 | ||
![]() |
Ondřej Wojewoda, Ph.D. | 21.6.2021 15:06 | ||
![]() |
Ondřej Wojewoda, Ph.D. | 12.3.2021 12:42 | ||
![]() |
Pavla Roupcová, Ph.D. | 18.3.2025 11:24 | Sample holder handling | |
![]() |
Peter Fecko | 31.1.2022 11:00 | ||
![]() |
Jiří Holas | 27.8.2021 13:54 | ||
![]() |
Radim Hrdý, Ph.D. | 13.11.2023 09:41 | ||
![]() |
Marek Eliáš, Ph.D. | 25.3.2025 15:09 | ||
![]() |
Radim Hrdý, Ph.D. | 15.8.2024 18:17 | ||
![]() |
Marek Eliáš, Ph.D. | 9.2.2018 16:38 | ||
![]() |
Vojtěch Švarc, Ph.D. | 7.11.2024 22:51 | ||
![]() |
Petr Viewegh, Ph.D. | 9.2.2018 17:18 | ||
![]() |
Filip Münz, Ph.D. | 9.2.2018 16:48 | ||
![]() |
Petr Bábor, Ph.D. | 5.3.2024 14:20 | successful installation. | |
![]() |
Radim Hrdý, Ph.D. | 19.8.2022 10:21 | ||
![]() |
Kateřina Tmejová, Ph.D. | 12.9.2023 10:47 | ||
![]() |
Vojtěch Švarc, Ph.D. | 17.3.2023 11:56 | ||
![]() |
Kateřina Tmejová, Ph.D. | 14.5.2025 09:12 | Fume hood II - Schlenk line instalation, Spincoater is uninstalled - ask the guarantor for reinstall | |
![]() |
Jiří Holas | 27.8.2021 14:02 | ||
![]() |
Petr Lepcio, Ph.D. | 22.10.2024 18:50 | ||
![]() |
Petr Lepcio, Ph.D. | 31.1.2025 13:13 | ||
![]() |
Jiří Holas | 3.4.2025 13:53 | ||
![]() |
Ondřej Man, Ph.D. | 19.10.2023 10:57 | ||
![]() |
Peter Fecko | 4.8.2021 10:54 | ||
![]() |
Vojtěch Švarc, Ph.D. | 22.6.2018 08:43 | ||
![]() |
Marek Eliáš, Ph.D. | 13.3.2025 17:02 | ||
![]() |
22.6.2018 08:43 | |||
![]() |
Vojtěch Švarc, Ph.D. | 22.6.2018 08:43 | ||
![]() |
Jiří Holas | 17.10.2024 11:10 | ||
![]() |
Jiří Holas | 27.8.2021 14:06 | ||
![]() |
Prof. Eric Daniel Glowacki, Ph.D. | 26.8.2021 14:05 | ||
![]() |
Jiří Holas | 3.9.2021 10:21 | ||
![]() |
Jan Prášek, Ph.D. | 22.3.2025 22:20 | ||
![]() |
Marek Eliáš, Ph.D. | 10.4.2025 10:51 | ||
![]() |
Josef Polčák, Ph.D. | 19.5.2025 09:17 | ||
![]() |
M.Eng. Lizeth Katherine Tinoco Navarro | 1.8.2024 10:18 | ||
![]() |
Josef Polčák, Ph.D. | 1.11.2024 09:15 | ||
![]() |
M.Eng. Lizeth Katherine Tinoco Navarro | 23.7.2024 10:55 | ||
![]() |
Stanislav Průša, Ph.D. | 14.9.2023 10:20 | ||
![]() |
Kateřina Tmejová, Ph.D. | 4.9.2024 15:08 | Record 1 | |
![]() |
Josef Polčák, Ph.D. | 19.5.2025 09:19 | ||
![]() |
Kateřina Tmejová, Ph.D. | 15.12.2022 08:54 | ||
![]() |
Josef Polčák, Ph.D. | 19.5.2025 09:17 | ||
![]() |
Pawel Jewula, Ph.D. | 11.2.2025 11:11 | A new version of MNOVA was installed. | |
![]() |
Ondřej Man, Ph.D. | 20.5.2025 12:39 | ||
![]() |
Josef Polčák, Ph.D. | 19.5.2025 09:20 | ||
![]() |
26.3.2025 18:05 | |||
![]() |
Josef Polčák, Ph.D. | 19.5.2025 09:19 | ||
![]() |
Jiří Zita, Ph.D. | 6.4.2023 10:48 | ||
![]() |
Jiří Holas | 11.11.2024 11:07 | ||
![]() |
Jiří Zita, Ph.D. | 6.4.2023 10:50 | ||
![]() |
Peter Fecko | 14.4.2025 13:13 | ||
![]() |
Alois Nebojsa | 15.7.2024 10:16 | ||
![]() |
Jiří Holas | 27.8.2021 14:22 | ||
![]() |
15.5.2025 14:27 | |||
![]() |
Dinara Sobola, Ph.D. | |||
![]() |
Jiří Holas | 19.8.2024 13:36 | ||
![]() |
Jan Michalička, Ph.D. | 7.2.2025 13:47 | Probe corrector upgrade | |
![]() |
Dina Kičmerová, Ph.D. | 20.5.2025 10:59 | ||
![]() |
Marek Eliáš, Ph.D. | 19.2.2024 13:47 | ||
![]() |
Radim Hrdý, Ph.D. | 6.5.2025 12:33 | ||
![]() |
Ondřej Caha, Ph.D. | 22.5.2025 08:39 | ||
![]() |
Filip Ligmajer, Ph.D. | 2.8.2022 10:33 | contact Filip Ligmajer | |
![]() |
M.Sc. Saeed Mirzaei, Ph.D. | 21.4.2021 09:19 | ||
![]() |
Jan Prášek, Ph.D. | 28.1.2025 14:02 | ||
![]() |
Kateřina Tmejová, Ph.D. | 11.11.2024 13:08 | ||
![]() |
Kateřina Tmejová, Ph.D. | 10.5.2024 11:22 | ||
![]() |
M.Eng. Lizeth Katherine Tinoco Navarro | |||
![]() |
Kateřina Tmejová, Ph.D. | 19.7.2024 11:23 | The removal of the sealing device by the service for inspection | |
![]() |
Radovan Klusák | 26.6.2023 14:27 | ||
![]() |
Michal Urbánek, Ph.D. | 19.4.2024 13:56 | ||
![]() |
Marek Eliáš, Ph.D. | |||
![]() |
28.2.2025 11:00 | |||
![]() |
Peter Fecko | 3.7.2023 12:29 | ||
![]() |
Tomáš Šamořil, Ph.D. | 17.4.2024 11:09 | ||
![]() |
Richard Kolář | |||
![]() |
Dominik Varga | 27.8.2018 16:23 | Only for CF staff (for full-service ask Dominik Varga) | |
![]() |
Klára Jelénková | 6.5.2025 16:36 | ||
![]() |
Radim Hrdý, Ph.D. | 15.8.2024 16:54 | ||
![]() |
Peter Fecko | 30.3.2023 12:18 | ||
![]() |
Jiří Holas | 27.8.2021 13:44 | ||
![]() |
25.10.2024 13:36 | |||
![]() |
Marek Eliáš, Ph.D. | 26.2.2025 11:06 | ||
![]() |
Jiří Holas | 15.11.2023 10:34 | ||
![]() |
Imrich Gablech, Ph.D. | 21.2.2023 09:01 | ||
![]() |
Martin Kareš | 26.2.2018 16:52 | ||
![]() |
Radim Hrdý, Ph.D. | 30.5.2023 15:04 | ||
![]() |
Jiří Holas | 27.8.2021 14:33 | ||
![]() |
Jiří Zita, Ph.D. | 6.6.2024 10:47 | Minimal CO2 weight for CPD cycle | |
![]() |
Marek Eliáš, Ph.D. | 11.10.2024 10:19 | ||
![]() |
Vojtěch Švarc, Ph.D. | 28.8.2023 14:30 | ||
![]() |
Dr. Ing. Michal Staňo | 5.3.2024 13:58 | ||
![]() |
Filip Münz, Ph.D. | 13.5.2019 15:57 | ||
![]() |
Josef Polčák, Ph.D. | 22.8.2024 14:05 | ||
![]() |
||||
![]() |
Dr. Jaganandha Panda | |||
![]() |
Michal Potoček, Ph.D. | 9.4.2025 13:34 | ||
![]() |
Jan Prášek, Ph.D. | |||
![]() |
Michal Urbánek, Ph.D. | |||
![]() |
Josef Petruš, Ph.D. | |||
![]() |
Josef Petruš, Ph.D. | 28.4.2025 09:18 | Deformation of Pt wire and heat shield - fixed! Rupture of elastomeric gasket - replaced! | |
![]() |
Vojtěch Švarc, Ph.D. | 14.4.2025 11:33 | The sewage tube changed to the small sewage container - clean that after usage | |
![]() |
Petr Lepcio, Ph.D. | |||
![]() |
Petr Lepcio, Ph.D. | |||
![]() |
Petr Lepcio, Ph.D. | 29.7.2024 13:22 | ||
![]() |
Dr. Viktor Danchuk | 4.3.2025 16:28 | ||
![]() |
Peter Fecko | |||
![]() |
Kateřina Tmejová, Ph.D. | 15.5.2025 08:28 | Spincoater is uninstalled due to the Schlenk line instalation in the Fume Hood II - ask the guarantor for reinstall | |
![]() |
Kateřina Tmejová, Ph.D. | |||
![]() |
Kateřina Tmejová, Ph.D. | 8.11.2024 19:42 | The service on air flow regulators for hoods, covers, etc. | |
![]() |
David Prochazka, Ph.D. | 26.2.2018 16:52 | ||
![]() |
Kateřina Tmejová, Ph.D. | 8.11.2024 19:41 | The service on air flow regulators for hoods, covers, etc. | |
![]() |
4.6.2024 16:45 | |||
![]() |
Filip Münz, Ph.D. | 6.5.2024 14:56 | ||
![]() |
Klára Jelénková | 19.7.2023 14:49 | Instrument not used for long time, several checks/slight issues need to be resolved. Pumping system and compressor should be perfectly OK. | |
![]() |
Klára Jelénková | 21.3.2025 15:29 | ||
![]() |
Jan Prášek, Ph.D. | 2.5.2025 12:43 | Installed targets: Pt(1), V(2), Ag(3), Nb(4), FeRh(5), Hf(6), Co(7), SiO2(8) + oxygen | |
![]() |
Zdeněk Spotz, Ph.D. | |||
![]() |
Eva Kolíbalová, Ph.D. | 17.1.2025 15:17 | ||
![]() |
Vojtěch Švarc, Ph.D. | 9.10.2023 13:11 | ||
![]() |
Dinara Sobola, Ph.D. | |||
![]() |
Filip Münz, Ph.D. | 5.3.2019 09:58 | Testing regime - contact guarantee for assanator training | |
![]() |
Jiří Holas | 27.8.2021 14:23 | ||
![]() |
Tomáš Spusta, Ph.D. | |||
![]() |
9.2.2018 16:48 | |||
![]() |
Filip Münz, Ph.D. | 9.2.2018 16:44 | ||
![]() |
Jiří Holas | 27.8.2021 13:53 |